Rehearsal Report 4
Date: 2/11/2011
Start Time: 6:30
Break: 8:15 – 8:25
End: 9:00
Summary:
-With the absences, we walked through the scenes and reviewed blocking, pages 1-28 with those who attended in detailed fashion.
Director/Playwright:
-All off on Monday!
Props:
-For the Doc’s short scene, we added a stethoscope to the prop scene, and we have since decided to do away with it.
-Originally it was determined to have 3 chairs on each side for the company while they are not in scene. We would like to make that 4 per side, making that a total of 9 chairs including Aisa’s rolling chair in her workspace. And remember, 2 of the chairs that will be moved to the center platform on multiple occasions must be as close to a 90-degree angle as possible to hold the plywood.
-Does the dressmaker’s form roll? We are under the impression that it is indeed on wheels.
-Add a screwdriver to the props list.
Costume:
-For the father (Michael Regnier), he will need a robe with two ample pockets to fit a beer can and a newspaper in each. Also for Michael, his Doctor’s coat should also have two pockets for his head mirror and videocassette.
-Add a hat for Father character and Guard character and Frau Holda character. Brian is not concerned about what kind of hats, details to follow…
Set:
-The 3 tables needed at Aisa’s workspace have to be very small. We’ll place the typewriter table diagonally USL. Ideally, the typewriter and dollhouse tables will be small enough to just fit the objects. The sewing machine table can be slightly larger to accommodate small sewing props.
Misc:
-Changed Sunday’s meeting time from noon to 1pm. Debbie will come in first, then Michael and Lynna will follow at 2pm. Debbie will work all monologues, then the three will work any scenes that concern them all.
Sunday, Feb 13th 1 pm
Review Debbie, Michael, and Lynna’s scenes only. Jim, Sharmon, and Laura will be absent. John is excused.